Spec-Net Building Index
Safety Flooring Pty Ltd

Adhesive Backed Tactiles Installation from Safety Floorings

tactile installation

Comcork "Place n Press" Tactiles Installation Instructions

Thoroughly sweep and clean surface

Wire brush ground-in dirt if necessary

Clean off fine dust with Acetone

Peel back half the release paper.

Position Tactile in the desired location ensuring they are square.

Remove remaining release paper as the tile is lowered.

Tap firmly with a hammer or hammer and block along all outside edges as well as between all studs.

Once Tactiles are installed, they can be trafficked immediately.

safety tactile installation



Safety Flooring Pty Ltd Profile

02 9987 1777
0418 282 224

PO Box 724, Hornsby, NSW, 1630

Video

Safety Flooring Pty Ltd Profile

02 9987 1777
0418 282 224

ENQUIRE HERE

ENQUIRE NOW

Video






Related News Articles