Spec-Net Building Index - Home
Spec-Net Header Line

logo -




Spec-Net Terms of Use

 

HomeGuard subterranean termite management from Exopest Control


These guidelines are to be read in conjunction with the HomeGuard Certificate of Installation & Completion, the termite management notice(s), the warranty and association warranty document;

  • Regularly check the external perimeter of your building for signs of subterranean termite bridging and/or breaching of your HomeGuard Termite Management System.
  • Immediately notify your FMC Accredited HomeGuard installer should subterranean bridging and/or breaching of the HomeGuard Termite Management System be noted or suspected.
  • Do not store goods, refuse, timbers and/or firewood within 350mm of the perimeter of the external wall surface of any structure.
  • Keep external weep holes clear of vegetation, debris and/or soil to a recommended minimum of 75mm.
  • Ensure that your HomeGuard Termite Management System is maintained during and after any future construction and/or rectification works.
  • Do not change any treated soil level without first seeking advice from your FMC Accredited HomeGuard installer.
  • Ensure that your HomeGuard Termite Management System is maintained during and after an future landscaping works.
  • Ensure that you regular inspection and reports are undertaken at intervals as recommended by your Licensed Pest Inspector - at least annually and more often in high risk areas.

Contact your FMC Accredited HomeGuard installer should you have any questions in relation to your warranty and/or the Subterranean Termite Management Maintenance guidelines. Further information can be obtained from, and any warranty claims should be made by contacting FMC Australia.

dividing line  

For further information contact:
Exopest Control P/L
Address: 80-86 Buckhurst Street, South Melbourne, VIC, 3205
Phone:   03 8696 9....
Fax:   03 9682 6....

Web: www.exopest.com.au

To send an email to Exopest Control P/L, fill in the form below:

You Are: (* = required)

Project Stage:

*
*

Details