NEWS ARTICLE ARCHIVES



Raising the Floor at Broadmeadows Pool with Composite Engineering

Pool restructure with Composite Engineering
Day 5: All done! Floor secured & handrails checked for easy removal.

Broadmeadows Aquatic and Leisure Centre Raises the Bar...
actually the Floor...

another project supplied by Composite Engineering.

Earlier this year Hume City Council began an initiative to reduce the pool depth at Broadmeadows Aquatic and Leisure Centre from 1.3 metres to 1 metre. This was primarily to provide more flexibility for pool management to increase usage and programs.

Composite Engineering were happy to step up to this challenge and assist with the design work and material supply. The results, as you can see from the progress pictures, were outstanding.

Pool restructure with Composite Engineering
Left: Pool deep end empty and ready to begin the install. Right: Installing the structure in the morning.

Project News Add your Business

Home | About/Services | News Lounge | News Archive | Product Archive | Tender News | Testimonials | Conditions of Use | Privacy Policy

Company Listings:   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

facebook Twitter Instagram YouTube

© 2022 SPEC-NET