AFS Logicwall Structural Walling System projects Melbourne  Builder - Glenferrie Road, Hawthorne "The foremost advantage is their light weight in the individual panel form.If the project is made up of two or more buildings with no crane accessto the rear then both can be built at the same time. A 1.2m panel canbe carried manually by two men or a stack of several can be transportedon a pallet jack. Power lines out the front of a site often inhibits the use of large craneswhere as these can be lifted by long reach fork lift, small crane or evenplaced on a materials hoist. Because the sections have continuous reinforcement bars placedhorizontal and vertical as the sections are stood and braced they canbe designed with structural properties to span areas where the lowersupport is insufficient. This is some thing that you don't get withpre-cast concrete. Pressed steel door frames can be built into the walls prior to the concretecore fill giving a permanent totally ridged fixing unlike that of other fixingmethods. The installation of electrical conduits and switch boxes is asimple task. The sheeted sides are not as perfect as plasterboard butwith very little work can be made to an acceptable standard. They (AFS) don't need to take over the entire site likeconcrete precast who have several semi-trailers andbig cranes for any operation. I have built two apartment blocks with this product and I am about tostart a third. I appreciate the advantages this system has when it's nota simple spacious site."
For further information contact:
AFS Products Group Pty Ltd
Address: 22-24 Sommerville Circuit, Emu Plains, NSW, 2750
Phone: 1300 727 2... Fax: 1300 715 2...
Web: www.afswall.com.au
|