HEK MS CPF mastclimbing work platforms from Alimak Hek

Adding a new dimension to mast climbing configurations with the ability for two platforms to
share a common mast column, thereby eliminating a complete mast installation in certain configurations. This
means faster installation and dismantling, fewer ties, less make-good and fewer components, which means lower costs.
An additional benefit of the MS CPF is being able to share the common mast column with the Alimak CH passenger/material
hoist. This added versatility makes the MS CPF a cost efficient and highly productive vertical access solution for
long facades and other high-rise structures.
Depending on the configuration, the MS CPF has payload capacity up to 3,250 kg, maximum platform lengths of 27.6m and
a maximum height (anchored) of 100m.
Travel speed in any configuration is 12 m per minute - the maximum allowed by regulations for mast climbing work platforms.
As with all HEK models, high quality components are used throughout and exposed metal is either hot dipped galvanised
or protected with heavy-duty paint finish for durability.
For further information contact:
Alimak Hek Pty Ltd
Address: 2 Ausco Place, Dandenong South, VIC, 3175
Phone: 03 8795 6.... Fax: 03 8795 6....
Web: www.alimakhek.com.au
|