How to Build with ZEGO Building Systems in Six Easy StepsStep 1 Once the slab is completed, measure the outside, dividing walls and doorways. Then, mark out with a coloured chalk line on the floor. Place a 110mm wide damp proof course (DPC) or liquid membrane on the slab. Step 2 Now, fix the Patented Wall Brace Scaffold to the floor using 8mm reusable masonry anchors. Set the Wall Brace plumb, using a spirit level and the adjustable in-built screw tensioner. Step 3 Use a dumpy or laser level to mark a datum level on all Wall Brace Support Scaffolds.
|