NEWS ARTICLE ARCHIVESPrefinished Timber Components from Timber ImagineeringAttwood, Victoria This project involved the design, fabrication, delivery and install of 21 meter span HySpan LVL portal frames at 6 meter bay spacing. The timber components were prefinished in the workshop and delivered to site. The tapered column and rafter sections allowed for an effective yet graceful design. The design-build system allowed for the portal frames to be erected in liaison with the builder in a single day. Given the project's success we are currently fabricating Stage Two. |