NEWS ARTICLE ARCHIVESArchitectural LVL Timber Columns from Timber ImagineeringThis project at ST John The Apostle Primary School included the full design, detailing and shop fabrication of Architectural LVL timber columns and rafters supporting 2000m2 of roof. With our integrated drafting software and precision CNC cutting we were able to provide cost-effective and striking timber system that connected seamlessly with not only our timber, but the project steelwork as well. The shop fabrication of the timber also facilitated the parallel construction between the site works and the timber frame to help the builder stay on schedule.
|