Expansion Joint Installations with Activo Maintenance Products

expansion joint

Expansion Joint after hours

This project involved working within a fully operational shopping centre. Works were completed out of hours with all areas fully functional by operating hours.

These joints are installed level with the surrounding floor finish. The coverplate and base extrusions are exposed and a blockout on either side of the joint must be provided for when the slabs are first poured. Installation of the joint is normally carried out at, or just prior to, the laying of the floor finish.

  • Available in various sizes.
  • Available in Brass with Aluminium or Stainless Steel Coverplates.
  • Suitable for commercial and public constructions.
  • Installation is carried out simultaneously with floor completion.

Project News Add your Business

Home | About/Services | News Lounge | News Archive | Product Archive | Tender News | Testimonials | Conditions of Use | Privacy Policy

Company Listings:   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

facebook Twitter Instagram YouTube

© 2022 SPEC-NET