NEWS ARTICLE ARCHIVESExpansion Joint Installations with Activo Maintenance ProductsExpansion Joint after hours This project involved working within a fully operational shopping centre. Works were completed out of hours with all areas fully functional by operating hours. These joints are installed level with the surrounding floor finish. The coverplate and base extrusions are exposed and a blockout on either side of the joint must be provided for when the slabs are first poured. Installation of the joint is normally carried out at, or just prior to, the laying of the floor finish.
|