PUR-X® BLINDER Eliminates Concrete Blinding Layers on Site by NeofermaConcrete blinding has long been a standard step in construction, but it often adds time, cost, and complexity to project delivery. Neoferma introduces an alternative with its PUR-X® BLINDER system, designed to replace traditional blinding layers with a faster, more efficient solution. The system removes the need for excavation, concrete placement, and associated equipment such as pumps and heavy machinery. Installation can be carried out after hours or outside the project's critical path, helping to minimise disruption on active sites. With no reliance on wet trades, placement is not affected by weather conditions, allowing greater scheduling certainty. PUR-X® BLINDER provides a stable, high-strength base suitable for supporting reinforcement and, where required, waterproofing membranes. It is ready for follow-on trades within eight hours, reducing downtime and accelerating construction programs. The reduction in excavation and material use also contributes to lower transport and landfill demands. With no VOCs or TDIs, the system offers an environmentally considered approach while maintaining performance across a range of applications, including use above or below the water table. Reach out to Neoferma's team to replace concrete blinding with PUR-X® BLINDER.
|
Neoferma Australia Pty Ltd Profile 07 5576 4922 West Burleigh, Qld, 4219 Shop Neoferma Australia Pty Ltd
|