Hard Granite Rock Removal for Oman Highway by Neoferma![]() Left: Area where rock must be removed. Right: Concrete water tank in the background. ECOBUST Al Fatah Highway, Oman - Removal of Hard Granite Rock Al Fatah Highway, Oman - a stretch of highway running through very hard rock in the mountains of central Oman - needs to pass close to a concrete water tank structure. The use of explosives around that area is not permitted to prevent damages to the concrete water tank. The contractor was using a chisel machine, but the chisels were blunt within a day and had to be retooled constantly. The progress using chisels was very slow and it would take too long to finish the job. ECOBUST Solution For the stretch of the highway close to the tank, ECOBUST was considered because:
ECOBUST Methodology To test the efficacy of and to determine the optimal spacing between the holes, a demo trial was set up. In the areas where explosives were used, the explosives were inserted in holes with a diameter of 75 mm. There was a 75mm drill rig available on site. For this project, the large-hole diameter ECOBUST was chosen, so the drill rig available could be used to drill the cracking holes. ![]() Drill rig that was available on site. Holes were positioned 30cm and 50cm apart, and drilled about 1.5 metres deep. ECOBUST was mixed (15kg bag of ECOBUST with 1.5 litres of clean water) and poured into the holes. ![]() The rock mass was cracked within about 36 hours. ![]() Cracking of the rock after 36 hours.
|
Neoferma Australia Pty Ltd Profile 07 5576 4922 West Burleigh, Qld, 4219 Shop Neoferma Australia Pty Ltd
|