Solving Waterproofing Problems for RailCorp from Projex Group![]() RailCorp looks to Wolfin for highly engineered solution The Wolfin Membrane System was specified by the engineering design teams at RailCorp and Leighton Holdings to solve a waterproofing problem in RailCorp's Sydney freight rail infrastructure. As part of this project, Andersal Engineering has installed the Wolfin Membrane System for Leighton into the culvert at Coxs Creek. The culvert sits directly in the soft, wet earth of the creek bed and its entire surface area is exposed to moisture. Encasing the culvert's reinforcing steelwork in concrete wasn't possible due to the construction process. An alternative solution was needed to provide sufficient water-protection to prevent moisture from the damp earth seeping into the concrete and penetrating the steelwork, leading to rusting, spalling and structural problems. To provide a reliable, long-term waterproofing solution, and necessary protection to the steelwork, Andersal Engineering (Licensed Wolfin Applicators) installed two systems from Projex Group (Wolfin and Cosmofin Membranes) to the underside of the slab. With a watertight structure secured, RailCorp has announced the project - which is being funded by the Federal Government - as nearly complete and the freight trains ready to roll. Licensed Wolfin Applicator: Andersal Engineering
|
02 8336 1666 Westfield Commercial Office Tower Suite 506, Level 5 152 Bunnerong Road, Eastgardens NSW 2036
|