Concrete Footings from Zego Building Systems![]() Concrete footings stepped and level. When building off strip footings, any steps are recommended/preferred to be in levels of 300mm ie. 300-600-900-1200 etc. If you are using ZEGO Wall props, allow a 200mm clearance area to one side of the wall, so the wall props can be bolted down.
|