Efficient Warehouse Heating Solution Case Study by Heat-On![]() Heat-On was requested to do a quote & measure at a poorly insulated warehouse building located in Melbourne's south eastern suburbs. The operators of the building wanted to provide spot heating to 3 separate areas within the building. Heat-On's proposal was submitted and the operators continued their research by speaking with other heating suppliers and after receiving other quotations and conflicting information they returned to Heat-On. Why? This is because Heat-On's heating equipment is very competitively priced with very low power consumption and for this site didn't even require an electrical contractor to carryout the installation of the equipment, as existing power points could provide enough power to run 6 heaters!
Total power installed: 4.2kW (4 x 600W & 2 x 900W panels)
|
1300 737 104 Sydney: Suite 16, 1-5 The Crescent, Dee Why, NSW, 2099
|