Spec-Net Building Index
Aco

Stormwater Drainage for Existing Kerbside Structures from ACO

epping train station

Epping Train Station has developed into one of Sydney's major interchange and transit hubs and has recently undergone a significant upgrade - affecting it's adjacent roadway infrastructure.

The station has three above ground platforms linked by an overhead pedestrian walkway and two below ground platforms.

The surrounding roadways needed to be realigned and regraded to accommodate the extra space required for the extension to the overhead walkway.

KerbDrain

The designers were concerned with Langston Parade as the existing drainage infrastructure could not be moved. They also required all of the surface water to be captured, ensuring the safety and comfort of commuters.

ACO's KerbDrain QK200B was specified as it efficiently removes all the stormwater from the road surface and is aesthetically compatible with the existing kerb structures.

KerbDrain transforms kerbs into continuous inlet structures with minimal excavation.

For more product information visit: www.acoaus.com.au/infrastructure



Aco Profile

1300 765 226

Emu Plains, NSW, 2750

Aco Profile

1300 765 226

ENQUIRE HERE

ENQUIRE NOW






Related News Articles