PowerDrain S300K in Pacific Highway Upgrade from ACO Polycrete![]() Located along the heaviest trafficked section of the Pacific Highway in New South Wales, the Banora Point Upgrade project involved the construction of a 2.5km, six lane divided highway with a major viaduct, land bridge and interchanges at both ends. The $321m project is in a busy urban setting that will provide a freeway link between the Chinderah Bypass and Tweed Heads.![]() In a highly confined urban area, the project designers solved the challenge of draining a reduced shoulder width by using ACO's PowerDrain S300K to ensure all surface water was captured quickly and for any resulting width of ponding to not encroach into the traffic lanes.
|
1300 765 226 Emu Plains, NSW, 2750
|