Timber Flooring Over Moisture Vapour Barriers with MAPEI![]() System for the Installation of Timber Flooring Over a Moisture Vapour Barrier ![]() Please refer to the corresponding Work Method Statement for complete list of suitable products and installation information or for over 95% RH - 7 day old concrete. For more information regarding Timber Flooring Over Moisture Vapour Barriers with MAPEI, visit www.mapei.com.
|
07 3276 5000 180 Viking Drive, Wacol, Brisbane, QLD, 4076
|