Spec-Net Building Index
AFS Systems

Fast Floor-to-Floor Cycles with LOGICWALL® by AFS

Fast Floor-to-Floor Cycles from AFS

Fast Floor-to-Floor Cycles Kept Hotel Project on Time - Check out the LOGIWALL® Quality of This Hotel

Hotels require their finish to be 'a cut above' so Novati Constructions knew walling would be key to satisfying everyone. Having done their research they were keen to use AFS LOGICWALL®, recognising that 147 rooms would be a true test of its benefits. They weren't disappointed.

Perhaps their most pleasing discovery was how much LOGICWALL® accelerated the floor-to-floor cycle. This proved doubly important for an eight level project on a 15 month design and construct contract which had to include "alternative solutions to satisfy operational requirements."

Alternative solutions to satisfy operational requirements from AFS



AFS Systems Profile

1300 727 237

110 Airds Road, Minto, NSW, 2566

Video

AFS Systems Profile

1300 727 237

ENQUIRE HERE

ENQUIRE NOW

Video






Related News Articles